Resource Introduction:
As a general rule, when there is a breach of contract, the injured party—in the case of a building owner and architect/engineer, the owner—must receive what they had a right to under the contract, but no more. A windfall or a benefit greater than would have been received had the contract been performed correctly is not allowed at the expense of the performing party or architect in this case.